(1) 12’ U-CHANNEL POST
(1) 30’’ STOP SIGN
(2) HARDWARE
(2) CONCRETE
We removed the damaged post and sign. Replace it for a new one and finish it with concrete.
Labor: 4h
Materials: 125$
BILLED OUT BKK
Enter the destination URL
Or link to existing content