CUT OUT APPROX 10’ OF CURBING ALONG WITH A CORNER SPOT ON SAME ISLAND
INSTALL REBAR #3
FORM AREAS
POUR CONCRETE 4000 PSI
BROOM FINISH AREAS
(1) bags concrete 60.00
(2) rebar 20.00
(6) labor 720.00
We removed the damaged concrete for new with rebar.
Labor: 2 guys 3h
Enter the destination URL
Or link to existing content