STORM DRAIN BY MARINES SPACE
CUT 12’’ AROUND STORM DRAIN
REMOVAL OF DAMAGED CONCRETE
DOWEL TO EXISTING, INSTALL REBAR WITH EPOXY
POUR 4500 PSI CONCRETE
STORM DRAIN 1750.00
REPAIR ASPHALT AROUND STORM DRAIN
1/2 TON 3 hours 3 guys 465.00
565.00 with asphalt
25’ by 4’ area
2 tons of asphalt
1500.00