17X8=136 (1.500) 136 SQ FT/ ASPHALT LABOR TOTAL
(7) 12X18 HANDICAP SIGNS (7) 250.00 FINE SIGNS (14) HARDWARE MATERIALS LABOR TOTAL (3) CAR STOP MATERIALS LABOR TOTAL (7) CAR STOPS RE-PAINT HANDICAP BLUE
(2) AREAS ON SIDE OF GYM NEED GROUND DOWN MATERIALS LABOR TOTAL
56 linear ft crack to fill on the sidewalk. Materials (5/6 tubes of sealant) Labor: 4h- Total Cost –