Subject: HV - fill concrete cracks at TFM dock
Closed
Bosco Pery

See attached. Can you fill those cracks in a manner that would withstand large trucks driving on it? My main concern is protecting those cleanouts, making sure the ground around them is stable so the pipes don’t crack.

I THINK WE SHOULD USE COLD PATCH. WE MAY NEED TO APPLY TACK TO THE CRACKS FIRST

YOU HAVE TO WAIT FOR THE TACK TO TURN BLACK BEFORE PUTTING THE COLD PATCH IN

YOU SHOULD GRAB THE TRAILER AND BRING THE YELLOW COMPACTOR. BRING A PUMP SPRAYER TO PUT WATER IN IT. YOU HAVE TO WET THE BOTTOM OF THE COMPACTOR BEFORE COMPACTING THE ASPHALT 

replies
Boscop6445
Commented on
2026-02-04 12:02:24

We filled cracks with cold patch.

LABOR: 1h

Materials: 30$ (asphalt binder, cold patch)

Add reply
Reply
Attachments
Maximum file size: 10 GB

Ticket info
ID
1682978
Author
Bosco Pery
Priority
High
Status
Work Complete
Created at
Jan 8, 2026 6:25 pm
Updated at
Feb 5, 2026 7:48 am
ETA
Department
CMGS Technicians
Agent
Boscop6445
This ticket was created from ticket Harbour Village
Bosco Pery's tickets

Add New User

Edit Ticket

Subject
Ticket Status
Location
ETA
Department
Priority
Ticket Details
Attachments
Maximum file size: 10 GB